Exxon, Qatar & Golden Pass: Something’s Gotta Give

Analyzing Project Costs & Logistics In The COVID Era
(Part 1 of 2 – Satellite Image Analysis Later This Week)

  • Golden Pass: 4 Key Takeaways……………………………………Page 2
  • EPC: Monthly Progress Evolution……………………………….. Page 3
  • April 2020 Project Update…………………………………………Page 4
    • IP & Construction Activity ……………………………………Page 5
    • Labor Logistics In The COVID Era ………………………….Page 6
    • Cost Analysis – Significant Overruns Already?……………Page 8
    • COVID-19 Impact …………………………………………….Page 9
  • December 2019 Baseline
    • Partner Organization, Key Participants ……………………Page 10
    • EPC Roles: MDR, Zachry, Chiyoda …………………………Page 12
    • Variance Analysis …………………………………………….Page 14

For access information, please email us at [email protected]

Key Takeaways:

1) What’s Eating Golden Pass? QP & XOM Get Squirrelly In Press. On April 6th, the NYT ran an exclusive quoting Saad al-Kaabi (former QP CEO & current Qatar Energy Minister) as saying Golden Pass (GPX) was proceeding and on schedule. However, that was quickly followed by QP’s 30% partner Exxon (XOM) cutting $11B of 2020 CAPEX, delaying FID for Rovuma LNG (Mozambique), reiterating Coral LNG’s development, while ignoring GPX altogether. Since then, the NYT took down the article, energy markets are upside down, & questions mount. Based on actual EPC progress, we believe the reaffirmed GPX schedule falls somewhere between…..continued (Pages 2-3)
2) Is Golden Pass In Trouble? Monthly Progress Analysis. We believe GPX’s engineering has remained well behind schedule. Data suggests GPX has been attempting (unsuccessfully) to ramp labor earlier than planned…continued (Pages 9 & 13-14)
3) Labor Logistics In The COVID Era…On 4/17/20, GPX requested additional on-site parking amid challenges with safely busing craft workers to the site amid a global pandemic, however busing craft workers wasn’t supposed to begin for another year (2021). This minor, intuitive disclosure actually offers a few significant read-throughs for the project, as well as its path moving forward…continued (Pages 6-8)
4) Cost Overruns Poised To Accelerate From Here? Over the next 6 months we believe the project is already looking at construction cost overruns (relative to its baseline schedule) of at least…continued (Page 7)


Click here to buy this report

Read More

W|EPC Utilities & Energy – Sempra Deep Dive – Oncor, March 2020

 Sempra (SRE) Capital Project Analysis – Oncor March 2020.

As part of our W|EPC Utility & Energy Project coverage, we’ve put together a deep dive into a number of large public utilities, including SRE, SO, D, AEP, CNP, ENB, EPD, ET, KMI, XOM, TOT, RDS:A, and others. We’ve included more information about our W|EPC Utility & Energy project coverage in the back of this presentation.

Given its size, and the sheer volume of projects and jurisdictions, we’re breaking our Sempra (SRE) coverage down into underlying components, with our Oncor deep dive below. Oncor Electric Delivery Company, LLC, is headquartered in Dallas, TX and is a regulated electrical distribution and transmission business. It is owned by two investors, SRE (80.25%) and Texas Transmission Investment LLC (19.75%).

Our Key Takeaways On Oncor:

  • Out-sized Role In Critical TX Projects
    • Oncor is involved with 5 out of the 10 most important projects to provide more efficient electricity dispatch, while supporting the increasing electrical demand in Texas. (Page 5)
  • Oncor vs. Other Investor Owned Utilities
    • Oncor has 156 more projects scheduled to be completed in 2020 than AEP, ET (50% AEP/50% Berkshire Hathaway) and CNP combined. (Page 8)
  • Final Estimates vs. Final Actual Costs
    • Over the last 15 months, Oncor’s reported final construction costs for 190 projects were 12% higher than their final estimated costs. (Pages 9-10)
  • Lubbock Power and Light
    • Oncor’s May 2019 acquisition of InfraREIT included a variety of electricity transmission and distribution projects & assets, which included ~$3600MM joint project with Lubbock Power and Light (LP&L). (Pages 13, 17-20)
  • Future Project Opportunities
    • The integration of LP&L to ERCOT should reduce congestion costs in the Panhandle of Texas and increase demand for new transmission projects in/and around Oncor’s coverage area. (Page 4)