Webber Research: Venture Global LNG – Plaquemines Parish Q422 Project Update
For access and subscription information, please email us at [email protected], or at [email protected]. To download this report, click here.
For access and subscription information, please email us at [email protected], or at [email protected]. To download this report, click here.
Read More
Read More
Read More
W|EPC: Venture Global – Nexus Approaching Drone &Satellite Image Analysis, Engineering Changes Q320
For access information, visit our New Online Store, or email us at [email protected]
• Calcasieu Pass Update – Key Takeaways (slide 2)
• Calcasieu Pass LNG Module Overview (slide 3)
• Importance Of Notification Window (slide 4)
• Engineering Changes: Pre-Treatment Modules (slide 5)
• Engineering Changes: Liquefaction Modules (slide 7)
• Technical Analysis: Changes & Impact? (slide 9)
• Satellite Image Analysis – Baker Hughes Module Yard (slide 13)
• Drone Image Analysis – Site Prep Update (slide 18)
• Remaining Questions (slide 23)
• Scenario Analysis & Predictions – Rubber Starting To Meet The Road? (slide 25)
• Disclosures (slide 27)
Key Highlights:
• Venture Global: The Looming EPC Nexus…
• Drone Image Analysis:
• Calcasieu Pass Outlook
• Consequential Damages, Predictions & Conclusions
Copyright: PLEIADES © CNES (2020), Distribution Airbus DS & W|EPC Analysis
For access information, email us at [email protected]
Read More• Supply Chain Overview Pages 1-2
• Satellite Images: BH’s Fabrication Yard In Avenza, Italy Pages 2-4
• Implications Of Calcasieu’s Unique Contractual/Structural Dynamics Pages 3-5
• Force Majeure Flow Charts: Wrapped vs Unwrapped Pages 4-5
• Pertinent Questions From Here Pages 5-6
For access information, please email us at [email protected]
The LNG Supply Chain & Force Majeure Dominoes. Given the continued, rolling implications of the global response to COVID-19, we thought it was worthwhile to examine potential points of friction as it pertains to the implications of Force Majeure (FM) declarations on large-scale, multi-faceted LNG export projects. We believe such a scenario is relevant for Venture Global’s Calcasieu Pass (CPLNG) project given its globally linked supply chain – including its liquefaction modules which are being fabricated at a Baker Hughes (BH) fabrication facility in Avenza, Italy. (Satellite images on Pages 2-4)
Venture Global’s Potential FM Predicament Is Unique. A typical, fully wrapped, EPC contract would typically just keep an owner on the hook for extensions to a contractor’s guaranteed completion date. However, the less expensive, decentralized contracting structure that Venture Global has assembled for CPLNG could potentially expose the project to contractors looking to recover mitigation and prolongation costs. (Pages 2-4)
Implications Of FM Claim For BH, Kiewit, & VG. We believe work on CPLNG’s modules was still progressing last week (with non-essential personnel working from home), given the escalation in restrictions we believe those productivity dynamics are (justifiably) fluid. Should BH file a successful FM claim, it would most likely be granted… (Pages 3-6)
For access information, please email us at [email protected]
Read More